Skip to main content
Search Again

We think these articles could help you:

    See More
    Nintex Knowledge Base

    Mass Generation Document Limits

    Summary
    When using Mass, is there a limit to the amount documents generated or size of those files?

    Solution
    There is no limit to the amount of documents, however, if the document generation takes longer then 15 mins, Salesforce will report a run-time error and the DDP will fail. Testing may be required to determine how many documents can be processed before exceeding this time limit. 
    • Was this article helpful?