Skip to main content
Search Again

We think these articles could help you:

    See More
    Nintex Knowledge Base

    Do Expected Durations Need To Be The Same Within Beginning and Ending Beacon Actions?

    Summary
    When configuring the Beginning and Ending Beacon actions within Nintex Workflow, do the Expected Duration values need to be the same within both actions?

    Solution
    Expected Duration will generally only be configured in either the Beginning or the Ending Beacon action not both. If Expected Duration is being configured within both actions, the value does not need to be the same. 
    • Was this article helpful?